Project Level Discussions Topic Guidelines
CTOC in association with the Transport Impact Minimisation(TIM) Group members have identified and outlined Project Level Discussions(PLD) Topic Guidelines for use and are now available within the Information and resources section. This document is intended to provide guidance and topics of discussion should a PLD be required for a project where the network impact requires discussion and verification of proposed methodologies.